How do you generate a screener report with a custom end date?

After clicking “Run Screen” for a older “As of” date the “End Date” is set to today. Is there a way to set the end date to a different period, for example three months after the start date? The screener used to be able to specify a custom end date before it was overhauled. This type of feature is very useful to find patterns of stocks that slip through the screener. For example if all the losing stocks were of poor quality then perhaps a quality filter is in order.

Thanks.

If you go to the ‘Main Settings’ tab you’ll see ‘End Date’ with some options as long as the ‘As Of’ date is not the current date.

ted

Thanks Ted, this works. The bug is still there though.

What bug? Your other post?

Yes.